Blog

How to label cabinet parts after cutting: what goes on the label and where
How to label cabinet parts after cutting: what goes on the label and where

A part label is written for the stations after the saw: the edgebander, boring, assembly. The five fields every label needs, what stays on the cut sheet, how to show edge banding and grain, what a barcode should carry, where and when the label goes on, and roll printer versus a sheet of labels.

Rip or crosscut first? How to read a cutting diagram before the first cut
Rip or crosscut first? How to read a cutting diagram before the first cut

Even without sequence numbers, the first cut is written in the drawing: the line that runs unbroken from edge to edge. The plan, the machine and the offcut decide rip or crosscut first. Strips and stages, the four marks on a plan, how the order shapes the offcut, and five checks before the saw.

Downtime reason codes: planned, unplanned, and what counts as lost time
Downtime reason codes: planned, unplanned, and what counts as lost time

How many downtime reason codes do you need, how should they be named and grouped into categories? Is a changeover planned downtime, and should breaks count? Two separate questions on every reason, an example list for a small shop, and what to do with reasons operators type in and reasons you no longer use.

Does grain direction matter? Which parts to lock on a cut list
Does grain direction matter? Which parts to lock on a cut list

Which parts follow the grain and which can turn? Why doors, finished ends and drawer fronts get locked while backs and drawer bottoms stay free, whether shelves are about looks or strength, how to measure what each lock costs, and whether the rule belongs on the material, the sheet or the part.

Downtime Pareto chart: which stop do you fix first?
Downtime Pareto chart: which stop do you fix first?

The downtime Pareto is in front of you: which stop do you fix first? Minutes or count, how to work out the cumulative percentage by hand, what the “No reason” and “Other” bars are telling you, whether planned stops belong on the chart, and why the tallest bar is not always job one.

Open quotes report: what to count before you total the list
Open quotes report: what to count before you total the list

At month-end someone asks how much is in open quotes. Exporting the list is easy; adding up the Amount column is where the figure goes wrong: revisions counted twice, expired quotes still open, US and Canadian dollars in one sum, a tax-inclusive total next to a net target. Four rules before you total it.

Quote numbering for multiple branches: one counter, or one per branch?
Quote numbering for multiple branches: one counter, or one per branch?

A customer calls about “quote 42”. If each of your branches keeps its own counter, there are two of them. One counter or one per branch? How to pick a branch code, where a quote saved without a branch lands, and what a month or fixed text in the number does to the counter.

Does a quote include sales tax if it doesn't say? Same lines, two totals
Does a quote include sales tax if it doesn't say? Same lines, two totals

A quote that is silent on sales tax is really two prices: the same two lines can read 5,800.00 or 6,177.00. Washington presumes the price excludes tax; California looks to the agreement; consumer pricing is stricter still. Whichever rule applies, one sentence on the document keeps the decision in your hands.

Payment terms and Incoterms on a quote: “balance on delivery” — which delivery?
Payment terms and Incoterms on a quote: “balance on delivery” — which delivery?

To the seller, delivery is the day the goods leave the dock; to the buyer, the day they arrive. If the “balance on delivery” in your payment plan and the Incoterm on the quote don't point at the same place, the due date lands on two different days. The fifth part of a payment row: the event the days count from.

How much discount can a sales rep give without approval?
How much discount can a sales rep give without approval?

How much can a rep discount before someone else signs off? There is no standard number. Work the limit back from your margin, know when a dollar threshold helps, and keep approval simple in a small team.

VAT rounding on a quote: per line or on the total?
VAT rounding on a quote: per line or on the total?

The customer added up the quote and got a penny less. What rounding per line and on the total each protect, half-up vs banker's rounding, discount order, VAT-inclusive prices and the payment plan's leftover penny.

Sales Map by Region: Per Capita or Total?
Sales Map by Region: Per Capita or Total?

A totals map often just redraws the census. Per capita, per customer or an index: which denominator answers which question, and why small regions mislead.

What to Include in an Export Proforma Invoice
What to Include in an Export Proforma Invoice

HS code, country of origin, Incoterm, bank details — the fields an export proforma needs already exist in Quote, just hidden by default. Where to turn them on.

Quote Stuck in Pending Approval? Here's Why
Quote Stuck in Pending Approval? Here's Why

A quote above the discount or amount threshold can't be sent and just sits waiting — with no notification to the approver. What actually happens.

Fixed Bin Locations or Chaotic Storage?
Fixed Bin Locations or Chaotic Storage?

Should every SKU own a bin, or should goods go wherever they fit? What decides it is not efficiency but whether every put-away is recorded as it happens.

Invoice Unit Code for Boxes and Cartons
Invoice Unit Code for Boxes and Cartons

A box is not a unit of measure, it is a container. Quantity unit and packaging type are two fields, and the package count is usually left blank.

Opening Stock When Switching ERP Systems
Opening Stock When Switching ERP Systems

The migration list comes from accounting, but every answer on it lives in the warehouse. Item codes, units of measure and pack sizes are decided on the dock.

Do I Need a GS1 Barcode or My Own Numbers?
Do I Need a GS1 Barcode or My Own Numbers?

One question decides it: will this code ever leave your system? If it does, the number must be allocated by GS1; if not, you design your own scheme.

Warehouse Bin Location Naming Convention
Warehouse Bin Location Naming Convention

Aisle, rack, level and bin: the decisions behind a location code. Fixed digit width, ambiguous characters and numbering that survives the next aisle.

Pallet Damaged in Transit: Who Is Liable?
Pallet Damaged in Transit: Who Is Liable?

Loading, stowing and packing are the sender's side of the job. Six rules for building a pallet that survives, and what to record before the truck moves.

What to Put on a Carton Label
What to Put on a Carton Label

What belongs on a carton label, how much data a barcode can carry and whether you need an SSCC. A field-by-field checklist from the warehouse.

How to Write a Delivery Note
How to Write a Delivery Note

What it must carry, when it is issued and how it differs from an invoice, plus the warehouse sequence from loading order to signed note.

What Is a Picking List?
What Is a Picking List?

What a picking list carries and how it differs from a packing list. Four picking methods and four ways to cut errors.

How to Prepare a Packing List
How to Prepare a Packing List

Which fields it must carry, how it differs from a delivery note and an invoice, and which mistakes stop a shipment.